The new stadium underconstructionconstruction(construct) for the Olympic Games measuring three times as big as the present one is due to be completed in two months.
【考点】名词词义辨析.
【答案】construction
【解答】
【点评】
声明:本试题解析著作权属菁优网所有,未经书面同意,不得复制发布。
发布:2024/4/20 14:35:0组卷:0引用:1难度:0.7